Monday evening, Yves Zsutty spoke to a packed room in Willow Glen about the status of the Three Creeks Trail as well as other trails within the city's growing network of multi-use trails. Yves was brought into the position when the city's trail system was just getting started and admittedly his own growth and expertise has grown right along with the the city's trail system.
He started out by updating the audience with several announcements;
- The recent awards given to the "Reach 6" extension of the Guadalupe Trail just south of the Children's Discovery Museum.
- A new iPhone app titled Transit and Trails.
- A new trail signage and mileage marker system to help emergency personnel locate those needing assistance.
- The planned improvements to the current bicycle under crossing under the San Carlos overpass near Bird Ave. and
- The latest survey showing that Bicycle communing has increased dramatically along the Guadalupe Trail system.
The trail extension noted as Reach six of the Guadalupe River was recently completed after many years of hard work between the
City of San Jose, Caltrans, and the Santa Clara Valley Water District. Not only is the trail much more scenic, but the new trail eliminates an unsafe steep portion that was right next to the creek.
Transit and Trails a new iPhone app by
Bay Area Open Space Council was also highlighted which details campgrounds, trails, and trail heads based on your current location. (I plan to review it within the next week or two).
Also Yves highlighted
new mile markers which will allow for quick deployment in the expansive
Guadalupe Trail system. Trail markers are located at quarter-mile increments, labeled with a unique icon and color defining the trail system. The combination of icons, colors and mileage figures makes the system more accessible to children and non-English speakers as they seek to communicate their location to 911 operators. With over 35 different trail systems within the city this will help to inform users who may be confused about their whereabouts.
The existing San Carlos (roadway) Overpass will undergo improvements and widening in the future. The city has plans to connect the bicycle path under the roadway to Diridon Station, but given the planned improvements on San Carlos, possible high speed rail construction, and a possible ballpark these complications could delay planning and construction.
Each spring the city conducts a trail usage survey along the
Guadalupe Trail and the last survey noted that
52% of the cyclists using the trails were commuters. With the planned paving of 6.4 miles of the trail north of 880 to Gold Street in Alviso it is expected that this number will climb even more. Mr. Zsutty compared the trail to a spine linking with other trails in the form of ribs to connect with this important north/south connector; given that San Jose's industrial geography puts housing in the southern part of the city and industrial land in the north portion of the city.
After listing off recent accomplishments Yves, quickly switched to updating attendees on the status of the Three Creeks Trail which was recently purchased from Union Pacific Railroad. The section also referred to as the Western Alignment spans from Lonus St. in the north to Minnesota Ave. on the southern portion. The city recently finished a large soil remediation project along the western alignment, ans the city will seek to provide an interim solution for the trail while putting together a master plan for the whole trail.
 |
Could the Three Creeks Trail be as popular as
New York City's High Line Park someday? |
The interim plan is to lay down some temporary solutions for the trail until funding for complete trail construction will take place. This will include a fence at grade crossings (intersection with the streets) to deter vehicles from driving onto the trail. Yves took a hand counted vote to see what type of fence would be appropriate in both aesthetics and cost.
During this interim period the trestle over the creek just south of Lonus St. will be fenced off to prevent access while an engineering study is performed by CH2M Hill, a global transportation engineering company.
Save Our Trails was instrumental in obtaining funding for the acquisition of the western alignment of the Three Creeks Trail and continues to work on the future acquisition of of the eastern alignment as well.
To find out more about what is happening on the San Jose City Trail system you can follow status updates on the
department's Twitter account.