Campbell's Public Works Department has announced new improvements coming to Hacienda Avenue between Winchester Boulevard and Burrows Road/San Tomas Aquino Road. This project, entitled the Hacienda Avenue Green Street Project, is anticipated to address existing concerns regarding pavement condition, missing sidewalks, improper drainage, as well as pedestrian and traffic safety in a manner that incorporates green street elements and sustainable design concepts.
Current design elements under consideration include:
Design elements to be considered include:
- Street pavement rehabilitation.
- Installation of missing sidewalks, accessibility ramps, and curbs and gutters.
- Installation of landscaped linear parkways along each side of the roadway that will be available to capture and percolate stormwater runoff.
- Reduction of heat island effect through the installation of additional street trees and a reduction to the overall asphalt pavement area.
| The project is made possible through a generous grant from the Proposition 84 Chapter 2 Integrated Regional Water Management (IRWM) Grant Program, administered by the State Department of Water Resources. This competitive grant program provides funding for projects that assist local public agencies to meet the long term water needs of the state including the delivery of safe drinking water and the protection of water quality and the environment. Additional grant funds have also been provided by the Valley Transportation Authority’s Community Design and Transportation Program, which allocates funding on a competitive basis to projects that are creative, enhance connections with transit facilities, employ innovative and high-quality design, improve the pedestrian environment, enhance economic vitality, make better use of the land, infrastructure, and resources, and/or improve community connectivity, liveability, sustainability, and sense-of-place. |
View Larger Map
City staff conducted meetings with the property owners along this stretch of Hacienda Avenue to collect additional input regarding the project, which will assist with the conceptual design process. Upon conclusion of the meetings with the adjacent property owners, the conceptual design will be presented to the community for additional review and input.
The following links are also designed to give you more information regarding this project:
- Council Memorandum (5.37 mb pdf) - Presented to City Council at the August 7, 2012 Study Session
- PowerPoint Presentation (4.63 mb pdf) - Presented to property owners
- Notice of Improvement Obligation (NIO) Frequently Asked Questions (FAQ's) (20 kb pdf)





