Thursday, September 20, 2012

Blossom Hill Pedestrian Overcrossing Bridge Ribbon Cutting

Aerial View of the site before
construction.
When September 28, 2012
Time: 11:00 am
Where: Meet in Lowe's Parking Lot at 5550 Cottle Rd., San Jose

Speakers:
Ash Karla: San Jose City Council Member, District 2 and VTA Board Director
Bijian Sartipi, Caltrans District 4 Director
Forrest Williams, Former City of San Jose Council Member
Michael Burns, General Manager VTA
Nicole Williams, former resident

Please RSVP to Jennie Loft at jennie.loft@vta.org or call (408) 321-5965 by September 26.

Here are some facts on the bridge:

Overview

This project constructed a bicycle/pedestrian bridge over Union Pacific Railroad (UPRR) tracks, Monterrey Road and Endicott Blvd, south of the intersection of Blossom Hill Road and Monterrey Road in San Jose.   The project will facilitate safe bicyclist/pedestrian access between residential neighborhoods and commercial developments on both sides of the UPRR tracks and Monterrey Road.

Objective

The purpose of this project is to meet the demand for safe and efficient pathways for bicyclists and pedestrians across UPRR tracks near the intersection of Blossom Hill Road and Monterey Road.
  • A 315-ft long prefabricated steel bridge structure with an inside width of 12 feet crossing over UPRR tracks, Monterey Road and Endicott Blvd (just south of the intersection of Blossom Hill Road and Monterey Road)
  • A 10-ft wide ramp that complies with Americans with Disabilities Act (ADA) requirements and stairs to allow users to access Cottle Road and Endicott Blvd pedestrian paths on the west side of the UPRR corridor
  • A 10-ft wide ramp that complies with ADA requirements and stairs to allow users to access Monterey Road pedestrian paths on the east side of Monterey Road
  • New sidewalks and curb ramps connecting to existing paths
  • Fencing to deter unsafe at-grade crossing of the UPRR tracks.

Operations

Upon completion, the City of San Jose will own and maintain the improvements.

Project Funding

 2000 Measure A Transit Improvement Program funds  $0.98 million 
 2006 State Proposition 1B Infrastructure Bond funds  $6.79 million
 Federal HighwayAdministation  $2.48 million
 City of San Jose  $0.25 million
 Total  $10.5 million

Project Schedule

 Environmental Documents Approved  February 2009
 Project Study Report Approved  May 2009
 Advertisement/Bids Anticipated  Fall 2010
 Construction Begins  Late 2010/Early 2011
 Construction Ends Summer 2012